1
Your current location:
Homepage
/
/
/
Guangzhou Rail Transit Line 11

Guangzhou Rail Transit Line 11

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0

Guangzhou Rail Transit Line 11

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0
Information

广州市轨道交通十一号线

 

广州市轨道交通十一号线

 

Construction Site:Hedong East Station-Nanshi Road Station-Yangang Station Section
Project Overview:After the interval line out of Hedong East Station, along the Fangcun Avenue from north to south, with 350m left curve, through the Guangzhou Shipyard, across the Pearl River, through the Nanshi Second Street residential housing into the Nanshi Road Station, out of the Nanshi Road Station, through the kindergarten of the paper, dormitory buildings, to the east through the industrial avenue and the Guangzhou-Foshan line into the Yanguang Station. The main strata crossed are medium-weathering muddy siltstone, slightly weathered medium-coarse sandstone and gravelly sandstone.
Equipment type: 2 sets of CSTE06280H earth pressure balance (hydraulic main drive)machine with excavation diameter of 6280m and main drive power of 945kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

 China Railway Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.