1
Your current location:
Homepage
/
/
/
Guangzhou Rail Transit Line 13

Guangzhou Rail Transit Line 13

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0

Guangzhou Rail Transit Line 13

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0
Information

广州市轨道交通十三号线

 

广州市轨道交通十三号线

 

Construction Location: Zhucun Station ~ Yuzhu Station Interval

Project Profile: The interval line is mainly laid along Zhongshan Road, side through the factory, residential buildings, gas station, military area, Guangzhou operation business headquarters, under the Hinzibao Bridge, A219 high bridge, BRT Lianxi Station, BRT Maogang Station and its footbridge and other buildings (structures). The main strata crossed by the interval are strong~weakly weathered sandstone, conglomerate sandstone, and strong~weakly weathered muddy siltstone.

Equipment type: CSTE06680H soil-pressure balance liquid-driven shield machine, 2 sets, excavation diameter 6680mm, main drive power 945kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

Guangzhou Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.