1
Your current location:
Homepage
/
/
/
Kunming Metro Line 4

Kunming Metro Line 4

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0

Kunming Metro Line 4

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0
Information

昆明市轨道交通四号线

 

Construction Site: XiaoCaiYuan Station -North Railway Station Section
Project Overview: Interval from Xiao Cai Yuan station out of the station along the meter track railroad channel laying, side through the Xiao Cai Yuan overpass continues to lay along the meter track across the Pan Longjiang River, in the YDK9 + 400 ~ YDK9 + 570 section, the interval tunnel linear transition to overlap section from parallel, left and right line vertical. On the distance of 1.8m, in YDK9 + 834 ~ YDK9 + 883 section through the Beijing Road and finally arrived at the North Railway Station tunnel. The main stratum is rounded gravel, gravelly sand, silt and clay.
Equipment type: 2 sets of CSTE06440E earth pressure balance machine with excavation diameter of 6440mm and main drive power of 770kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

 China Railway Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.