1
Your current location:
Homepage
/
/
/
Chengdu Metro Line 9

Chengdu Metro Line 9

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0

Chengdu Metro Line 9

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0
Information

成都地铁9号线

 

成都地铁9号线

 

成都地铁9号线

 

Construction Site: Shield Structure section from Incubator Station to Yuanhua Station
Project Overview: The section is located below Jincheng Avenue, the section of the section of heavy traffic, the line from the hatchery station along the Jincheng Avenue to the west - straight ahead, down through the intersection of Yizhou Avenue, Chengdu Shuangnan Road intersection in Chengdu High-tech Notary Public Office in front of the arrival of the Yuanhua Station. The main stratum is medium-dense pebble soil, strongly weathered mudstone, and local moderately weathered mudstone.
Equipment type:2 sets of CSTE06980E earth pressure balance machine, with excavation diameter of 6980mm and main drive power of 1400kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

Guangzhou Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.