Guangzhou Central Urban Underground Comprehensive Tunnel Project

Guangzhou Central Urban Underground Comprehensive Tunnel Project

Guangzhou Central Urban Underground Comprehensive Tunnel Project

Information

广州中心城区地下综合管廊项目

 

广州中心城区地下综合管廊项目

 

中铁山河工程装备股份有限公司

 

Construction site: 30#~29#~28# section
Project Overview: 28#~29# section mainly passes through strongly weathered muddy siltstone, moderately weathered marl, strongly weathered andesite, moderately weathered andesite, slightly weathered andesite; 29#~30# section mainly passes through strongly weathered muddy siltstone, moderately weathered muddy siltstone, slightly weathered muddy siltstone.
Equipment type: 1 set of CSTE6280H earth pressure balance (hydraulic main drive) machine, with excavation diameter of 6280mm, length of 85m, machine weight about 500t, installed power of 1654KW, the maximum thrust speed of 80mm/min.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

 China Railway Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.