Changsha Wanjiali Road 220KV Power Tunnel

Changsha Wanjiali Road 220KV Power Tunnel

Changsha Wanjiali Road 220KV Power Tunnel

Information

长沙万家丽路220KV电力隧道

 

长沙万家丽路220KV电力隧道

 

长沙万家丽路220KV电力隧道

 

Project Overview: Wanjiali Road 220KV Power Tunnel Teli West Road Intersection-Torch Intersection section length 6601.9m, the main strata for the conglomerate, pebbles, gravel, silty clay, muddy siltstone, the tunnel is basically along the Wanjiali Elevated Direction, under the Wanjiali Elevated, Liuyang River, Changsha Metro Line 3, the complexity of the section line environment, the shield construction settlement control requirements are high, and the tunnel exists in a number of radii The tunnel has a number of continuous turns with radius of 150 meters.
Equipment type: 2 sets of CSTE04350E earth pressure balance shield machine with excavation diameter of 4350mm, main drive power of 330kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

 China Railway Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.