1
Your current location:
Homepage
/
/
/
South-to-North Water Diversion Western Anyang City Water Transfer Project

South-to-North Water Diversion Western Anyang City Water Transfer Project

  • Categories:Water tunnel
  • Author:
  • Origin:
  • Time of issue:2021-01-06
  • Views:0

South-to-North Water Diversion Western Anyang City Water Transfer Project

  • Categories:Water tunnel
  • Author:
  • Origin:
  • Time of issue:2021-01-06
  • Views:0
Information

中铁山河工程装备股份有限公司

 

中铁山河工程装备股份有限公司

 

Construction site: Western Anyang City Water Transfer Project
Project Overview: The TBM construction section is dominated by muddy chart, limestone, amphibole porphyries and mudstone, with uniaxial saturated compressive strength of 8-80Mpa, 39.6% of Class III surrounding rock, 24.3% of Class IV surrounding rock and 36.1% of Class V surrounding rock, with medium rock strength, fault fracture zones, locally unstable holes and other unfavorable factors, as well as a long distance for the TBM to dig in, and a small diameter of the hole. The inlet of the tunnel project is located in the west of Xiabao village and the west side of the approach road of Zhonglian mine, the outlet of the tunnel is located in the southeast of Fanjiazhuang in Hengshui town, and the designed length of the tunnel TBM digging is 12.85km.
Equipment type: 1 set of CSTT4330E double shield TBM with excavation diameter of 4330mm, main drive power of 1400kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

Guangzhou Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.