1

core business

 

Your current location:
Homepage
/
/
/
Changsha Wanjiali Power Tunnel Shield Specialized Construction Project
Number of views:
1000

Changsha Wanjiali Power Tunnel Shield Specialized Construction Project

规格型号:
The Wanjiali Power Tunnel starts from Teli West Road in the south and ends at the planned Information Avenue North in the north, with a total length of about 7.6km. Teli Road-Laodaohe River North and Weisan Road-Boundary City Expressway North are shield sections. The shield section tunnel is a circular section with an inner diameter of 3.6m and an outer diameter of 4.1m, with a length of 5.1km.
Retail price
0.0
Market price
0.0
Number of views:
1000
Quantity
-
+
Stock:
0
Product description
Parameters

  The Wanjiali Power Tunnel starts from Teli West Road in the south and ends at the planned Information Avenue North in the north, with a total length of about 7.6km. Teli Road-Laodaohe River North and Weisan Road-Boundary City Expressway North are shield sections. The shield section tunnel is a circular section with an inner diameter of 3.6m and an outer diameter of 4.1m, with a length of 5.1km.

  China Railway Shanhe is responsible for the tunnel boring construction business of the shield section, including the complete set of equipment such as shield machine, professional construction boring, equipment maintenance and other specialized business.

 

中铁山河工程装备股份有限公司 中铁山河工程装备股份有限公司

 

We could not find any corresponding parameters, please add them to the properties table

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

 China Railway Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.