1
Your current location:
Homepage
/
/
/
Changsha Metro Line 4

Changsha Metro Line 4

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0

Changsha Metro Line 4

  • Categories:Subway tunnel
  • Author:
  • Origin:
  • Time of issue:2020-12-23
  • Views:0
Information

长沙轨道交通4号线

 

长沙轨道交通4号线

 

Construction Site:Hunan University Station-Fubuhe Station
Project Overview: The main strata are marl, carbonaceous mud-stone and sandstone, and it passes through the Civil Engineering College, Engineering Test Building, Software College and Graduate School of Hunan University.

Equipment type: 2 sets of CSTE06280H earth pressure balance (hydraulic main drive), with excavation diameter of 6280mm, and main drive power of 945kW.

Recommended

Earth Pressure Balance Machine
Details
Dual Mode Tunnel Boring Machine
Details

Useful Link:

Guangzhou Sunward

Tel:020-22338937
Address:25/F.,Building C1,Guangzhou Industrial Control,No.657 Huadi Avenue South,Zhongnan Street,Liwan District,Guangzhou City,China.